翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Clair – Fort Kent Bridge : ウィキペディア英語版
Clair–Fort Kent Bridge

The Clair – Fort Kent Bridge is a steel truss bridge crossing the Saint John River between Clair, New Brunswick in Canada and Fort Kent, Maine in the United States.
The bridge handles approximately 279,490 vehicle crossings per year and forms a border crossing on the International Boundary. It connects with Route 205 in New Brunswick and Route 161 and U.S. Route 1 in Maine, also forming the northern terminus of Route 1.
Since it is an international bridge, the Canadian portion of the structure is the responsibility of the Province of New Brunswick, while the American portion is operated by the State of Maine. The bridge was built in 1929–30 as a replacement for an existing cable ferry and a cable suspension footbridge. There are three steel through-truss spans of each for a total length of .
In 1995, the 1st pier from the New Brunswick abutment had major repairs done. In 1997, the steel members under the deck in the first 1.5 spans from the New Brunswick end were sandblasted then painted with a primer of inorganic zinc. In the same year the downstream exterior stringers in these 1.5 spans were replaced. In 1998, the downstream concrete curb in the first 1.5 spans from the New Brunswick end was replaced. In 2000, the New Brunswick end concrete abutment underwent a major restoration.
==Replacement==
In January 2011, the Maine Department of Transportation imposed a 2.7 ton weight restriction on the bridge after advanced deterioration of the bridge on Maine's side was discovered during a routine inspection. On January 28, 2011, officials from New Brunswick and Maine announced plans to build a new bridge and demolish the existing structure. Construction began on the new bridge in 2012 and the estimated completion date is June 30, 2014. It is expected to cost $13.9 million.
The new bridge opened on July 31, 2014. Demolition of the old bridge was underway by September 29th.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Clair–Fort Kent Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.